SignalESGet started
Automation

Automation is no longer a luxury.

Large manufacturers automated their engineering because they could afford a department to write and keep the rules. Signal carries the rules for you, and gets better every time your team corrects it.

Generators · for both industries

Describe what you need. Signal generates what your shop can build.

Two generators, one rule: your shop's construction standards, applied to a new job in seconds, with every part, fastener and joint already in the model.

Woodworking

Kitchen generator

Give it the room: straight, L, U or galley, the wall lengths, appliance spaces and countertop. It divides each wall into cabinets your shop can build, reuses the same side panels wherever the construction allows, and builds the kitchen in Fusion with every Lockdowel fastener in place. Cabinet Fronts adds doors, drawers and sink; Island adds an island with its aisles checked. Try the division:

Example rules for this preview: bases 600 deep and 900 high, uppers 400 deep and 720 high, 15 mm board. Each run starts with a 600 cabinet, and the rest of the wall is split evenly, up to 900 per base and 1,200 per upper. Your shop's rules replace these.

7Cabinets
4Cabinet types
4Side parts
42Panels
126LD fasteners
252LD pins
63Dowels
0Board m²
2.6 s

The default above is a real test. In Fusion, a 3,000 mm wall became 7 cabinets of 4 types sharing 4 side parts, with 126 Lockdowel fasteners and 63 dowels, exactly what the cabinet templates call for.

Coming next on the same rules: a closet generator for hanging, shelf and drawer modules.

TaskUsually done byWith Signal
Divide the walls into cabinetsDesigner, by handKitchen generator
Lay out a bar's modules and ribsDesigner, by handBuild generator
Place every fastener and hingeDesigner, panel by panelDerived from the joints
Decide which edges get bandedOperator, at the banderDerived from visibility
Cut list, nest and machine codeCAM programmerExporter + supplier programs
Nest a period's jobs togetherNobody: each job buys its own sheetsPlan
Check that the structure holdsAn outside engineer, or nobodyStatic Simulation
Weld sequence and shop drawingsEngineer, per weldmentDerived from the assembly
Quote and bill of materialsEstimator, retyping the BOMPriced from the model
Install order and crew timeSite lead, from experienceDerived from the assembly
Every drawing on this site

Drawn by Signal. Not by a drafter.

Every sheet you can open on this site was drawn by Signal from the Fusion model: laser, bending, tube, welding and finishing sheets, installation steps, site surveys, customer drawings, kitchen elevations, nests and simulation reports. Nobody placed a view, typed a dimension or filled in a table.

Style, set once

Every sheet follows it

Your title block, logo, sheet layout, units and language are set once. Every drawing after that follows them, for every part and every job.

Reviews, learned

Corrected once, drawn right after

Approve or correct a welding sequence or an assembly order, with its reason. Signal learns it, and every drawing from then on reflects it, without anyone redrawing a sheet.

Inspection, ready

Balloons and a CSV

Signal balloons the inspection drawing and writes the inspection points to a CSV, ready to build the inspection report.

Always current

Never an old revision

A sheet belongs to its export. Change the model, export again, and every sheet is redrawn to match.

Drawings and their reviews

What Signal draws, and how each sheet is checked.

Every sheet is checked automatically before anyone opens it: nothing outside the frame, no text over text. On top of that, each kind of drawing carries the review its job needs.

DrawingsReview it carries
Laser cutting, bending, rollingEvery inspection point ballooned on the sheet, and the same points written to a CSV for the inspection report. One list, so the inspector's number and Signal's never drift apart.
Tube cutting, tube bending, tube fold, tube joint, finishingThe automatic check before release.
Welding, one sheet per build stepEach sheet is approved or flagged with a discrepancy, with who and when, and prints its state: approved, open discrepancy or pending. A redrawn sheet goes back to pending; the weldment is released when every sheet is approved. The welding sequence is approved or corrected with its reason, and the sheets redraw with it.
Weld spec and assembly method, in the 3D reviewProposed, counter-proposed by the supplier, accepted by design; the customer adds constraints. Every step is kept, so the reasoning stays with the part.
Woodworking sample validationThe assembly views and final measurements the shop checks on the first sample, before everything ships flat pack.
Customer drawings: general arrangement, exploded modules, kitchen front elevationsMarked for customer review, with an approval line. Kitchen measurements are confirmed against the site survey.
Site survey, sheets and a readings CSVThe crew's readings are read back by point and judged against the tolerances; each filled copy is kept as a revision.
Installation, one sheet per step: a cabinet, a kitchen or a whole siteA cover with what ships, the tools, the crew and the time, and a final check with sign-off.
Simulation reportA pass or fail verdict; its gauge and weld suggestions are reviewed, and Signal learns from them.
Model summary, material forecast, nest reportsInformation for planning and buying; no approval.

Open any drawing to inspect it at full detail. Each one carries a Drawn by Signal stamp.

Continuous improvement

Signal learns from every design.

Every rule in Signal makes a proposal, and a person on your team approves it or corrects it. A correction is never just an edit. Signal keeps its own proposal, your decision, the reason and the features of the part, and pools them across jobs.

The next design starts from what the last one taught. Knowledge stays with the shop instead of leaving with whoever made the call.

1 · Propose

Signal derives

Fasteners, banding, weld order, nest, cost, install steps, each stated with the facts it came from.

2 · Review

Your team decides

Approve as proposed, or correct it and pick a reason. Signal only asks what could go either way.

3 · Record

Both are kept

Proposal, decision, reason, who and when, in an append-only log. A redrawn sheet goes back to pending.

4 · Improve

The rules move

Corrections pooled across jobs show where a rule is wrong. The rule is fixed once and every future design gets it.

Weld sequence

Every approved or corrected sequence is stored with the part's mass, joints and envelope as a training example.

Drawings

Approvals and discrepancies are tied to exactly what the sheet showed. A change re-opens the sheet.

Quotes

Won and lost bids keep their reason, so the next quote starts from what the market said.

First article

A variance from the model opens a change record and carries into the next revision.

Installation

Modelled crew time is printed next to the time observed on site, so the gap is visible.

Repeat orders

The routing, nests and inspection plan that made the part right are replayed on the next purchase order.

The log

Every decision keeps its reason.

WhenEntryPartWhoWhy

Example entries for one kitchen job.